ARA Wipptal

Campo di Trens
2022
<p>In the <strong>“ARA Wipptal”</strong> project, we were responsible for the complete redevelopment of the <strong>PLC control system and visualization</strong> of the wastewater treatment plant. The goal was to modernize the existing technology and ensure long-term operational reliability.</p>

In the “ARA Wipptal” project, we were responsible for the complete redevelopment of the PLC control system and visualization of the wastewater treatment plant. The goal was to modernize the existing technology and ensure long-term operational reliability.

<p>A key challenge was the <strong>integration of the new system during live operation</strong>. Through careful planning and execution, the transition was successfully completed <strong>without any production downtime</strong>, ensuring a reliable and efficient plant operation.</p>

A key challenge was the integration of the new system during live operation. Through careful planning and execution, the transition was successfully completed without any production downtime, ensuring a reliable and efficient plant operation.

More impressions
gallery image
gallery image
gallery image
gallery image
gallery image